Building Your Dream Home Part 2
b>Razing the Cottage
may have made more financial
sense. With new house plans and permits in hand, subcontractors The demolition effort itself hired and a Septic Design in basically consisted of three process, it was now time to raze parts. First, all of the the existing cottage. I furniture and appliances needed considered employing the local to be removed. Most of these fire department to burn it down, items were old and musty and were however I chose the demolition not worth saving. Next, the route instead. Though I did not excavator used a large backhoe contact the Fire Department, I and tore apart and crushed the was convinced that this route building into small pieces. would have led to multiple delays Finally, the excavator loaded the and pitfalls, as I would have debris into several 20 cubic yard been at the whim of several town dumpsters, which were then hauled employees and weather conditions. away by a dumpster company. The demolition route required Finding the appropriate dumpster only the excavator subcontractor company was a little bit of a and had less weather related challenge, as there are strict schedule risks. In addition, the regulations on the disposing of demolition cost and effort was certain home construction very reasonable. Within two days, material. In addition, the it was as if the cottage never dumpster costs can dramatically existed on the land. It is increase depending on how far important to note, however, that away their facilities are from the cottage was relatively small. the construction/destruction It was 22' x 30'. If the cottage site. had been significantly larger, then the Fire Department route Breaking Ground
all its jogs and step ups/downs After the cottage was razed, and would be located and installed the stakes were placed outlining per the plans. During these the boundary of the new home, it meetings a few adjustments were was time to break ground. This necessary to the foundation was a very exciting time as my plans, however with all the team dream was about to begin to take members involved the changes were shape. I was building a large minor and absolutely necessary. contemporary home with a wall of The changes helped prevent more windows facing the lake front. serious problems later on and Admittedly it was only a hole in ensured that the outside the ground, but this hole aesthetics of the home were represented the rough footprint maintained. of my future house. Seeing the hole, I could begin to more As I already indicated, the easily visualize my future home. foundation is extremely important to any quality home. If the Digging out the hole and foundation is not built upon a preparing the site for a solid footing, nor constructed of foundation is one of the most the appropriate concrete critical aspects of building a strength, the foundation walls new home. As a result, I spent will crack in short order. These several occasions with both the cracks can lead to water in the Excavator and Foundation basement, settling in the subcontractors reviewing the framing, and eventually cracks in house plans and the site prior the finished walls and ceilings. to, and during the excavation. It Consequently, it is imperative was imperative that all of us that the excavation site not only were on the same page to ensure be properly dug out, but also that the foundation walls, with backfilled with crushed stone and
sand to provide for a stable base After a couple of days, the and to enable proper drainage foundation crew installed forms underneath and around the home. for the concrete walls. A day In my case I had the excavator later the foundation walls were dig out sufficiently to enable poured. Three days later the 18" of crushed stone to be forms were removed and the backfilled into the hole and foundation walls were in. I then still meet my foundation plan had my excavator subcontractor requirements. return. After tarring the outer walls, just up to the level of Once the site was prepared for where the finished grade would concrete, the foundation crew be, he installed a perimeter installed concrete footings 18" drain around the foundation and wide and 12" deep. In addition then backfilled the foundation they installed several cement with clean sand and fill. It is footings in the middle of the important that boulders and clay house footprint for lally not be used as backfill material. columns. The footings represent Boulders can crack the foundation the base of the home and support walls while being pushed into the concrete foundation walls and place, and clay can lead to the home itself. Due to the fact improper drainage around the that it was winter, Calcium home. Chloride was used as an accelerator to speed the curing With the foundation in and time of the concrete. In addition backfilled I was ready for water had pooled in a portion of framers. the hole, so constant pumping was necessary during the curing time. The Framing Stage The framing stage is probably the
most exciting part of building a Fortunately, due to constant home. In a relatively short communication and quick problem period of time, literally days, a solving we were able to have the house begins to take real form. initial delivery of lumber arrive Within less than a week knee on the site within a day after walls were up, floor joists were the backfilling of the installed and a plywood sub-floor foundation. was down. After a couple of weeks, the first floor walls were It is important to note, that it up and ceiling joists were being is at this time of the project installed. I was so impressed I that the large outlays of money was convinced my new home was a begin to occur. Lumber costs for month ahead of schedule. Boy was a home construction are quite I wrong. large, and final payments are due to the Excavator and Foundation Before I elaborate on my subcontractors. misconception I should jump back Excavation/Sitework and for a minute. While the Foundation installations are a excavation work went on, I was significant portion of the cost also engaged with the Framing of building a home. In addition, subcontractor. The Framing the Framing subcontractor subcontractor needed to order requires a portion of his labor framing material including to be paid in advance. lumber, doors and windows, shingles and siding. Inevitably Also, it is very important that there were issues with the Homeowner Construction Insurance availability of material and be obtained prior to the delivery dates, and as a result, construction phase. This we spent a fair amount of time insurance protects the resolving these issues. Homeowner/Builder against
material theft and job injuries. level of complaining or prodding All of your subcontractors and I was unable to control my their employees should be insured framing subcontractor's work but don't count on it. During any ethic. building project, subcontractors are bound to hire extra help for Consequently, I had to contact my short stints and I would be plumbing, electric, and fireplace surprised if these temporary subcontractors to inform them of employees were added to the the delay. This was extremely subcontractor's insurance policy. painful to have to do, as I had The homeowner/builder insurance no definitive date on when I policy is small change compared would actually need them and each to the risk of theft or the of them had very full calendars. threat of injury lawsuits. As a result, to be able to call them at the last minute and As I indicated earlier, I was in expect for them to drop what they for a surprise with the framing were doing to come to work on my phase of my home. As mentioned, project was highly unlikely. the initial framing moved Again, through regular quickly. However it was still communication with these other winter and frequent snow storms subcontractors I was able to and extremely cold weather began mitigate some of this problem, to hit. This dramatically slowed however my project did experience progress. In addition, with the significant schedule slips due to fresh supply of snow it quickly my framing crews shenanigans. became apparent that my framing crew had an affinity to In retrospect, I am not sure what snowmobiling. So even on the I could have done to have sunny days my framing crew was prevented this problem. Reference frequently absent. No matter my checks on the Framing
subcontractor had been positive. rapport and regular communication I guess I should have asked what channel with all of your his hobbies were and made sure subcontractors. Do not assume they did not correspond to the anything during a project of this season I wanted the work done. It size. is also a fact that unexpected things do happen on any project To Be Continued ... and one should expect it and plan accordingly. For example, put In Part 3 of "Building Your Dream some contingency dollars and House", the Framing continues and schedule into your project for Rough Electric and Plumbing events such as mine. Also, I can begin. Stay tuned... not stress enough to establish a
About the Author:
Over the past 20+ years Mr. Donovan has been involved with building homes and additions to homes. His projects have included: building a vacation home, building additions and garages on to existing homes, and finishing unfinished homes. For More information http://homeadditionplus.com and