Building Your Dream Home Part 3
b>Exterior Framing Continues
I should comment briefly about
the sub-floor and exterior walls With the home's sub-floor down before I move on. and the exterior walls framed and up, the framing crew was on to I decided on using "¾" tongue and the roof. Though the roof was groove plywood for the rather simple in structure with sub-flooring rather than just a 12/12 pitch and no valleys OSB/particle board as I was it was a significant framing concerned that the OSB was too undertaking due to just the size sensitive to moisture. I was and height of it. The house was concerned about this, both from 32 feet wide by 44 feet in the construction phase and from length, and the exterior side normal home use. I was concerned walls stood 11 feet tall in the that during the construction great room. This exterior wall phase that snow and ice could height of 11 feet translated into potentially lead to damage such a roof ridge that was 27 feet off as warping. I have seen this the floor of the great room. before when OSB was used on Consequently staging was required sub-flooring. I was also to install the ridge pole and concerned that during the life of roof rafters. In addition, since the home, that there could be the span from the top of the water incidents, e.g. a leaking walls to the ridge was so long, dishwasher or washer machine that heavy 2x12s were required for the also could also lead to water roof rafters. Within a week, damage to the floor. I also however, the team had completed believe that plywood is stronger the installation of the roof and that it would provide for a rafters and the house began to more solid and rigid floor. take on real shape.
Regarding the exterior wall for stronger construction plywood framing I used 2x6 construction. is the way to go. This is typical in New England as the additional wall depth allows The sheathing effort took about a for higher insulation factors; a week to complete. During this must in colder climates. time exterior doors and windows showed up on the site. Staging Sheathing the Outside of the the delivery of material reduces Home theft and insurance risk as well as keeps a less cluttered In order to get plumbing and construction site. However, as I electric contractors onto a site have indicated earlier, typically they want the home communication is critical when "buttoned up". This includes the you are doing "Just-in-Time" roof shingled and the doors and material delivery. windows on. Thus my framing crew moved onto the exterior sheathing Installing Exterior Doors and once the walls and roof framing Windows were complete. The installation of the doors and As with the sub-floor, I again windows was a major undertaking chose plywood for the exterior for this project as the lake side sheathing for the same reasons view of the home was literally a mentioned earlier. On the wall of windows; 32 feet in width exterior walls "½" exterior grade and 27 feet in height. A great plywood was used. On the roof deal of engineering had gone into 5/8" exterior grade plywood was the window design so that the 10 used. I know many builders today large custom windows would fit use OSB for both the walls and together like a jig saw puzzle. roof, however, I still believe This said, when the windows
arrived on site and were bedrooms and closet areas. Within inspected, it was determined that just a few days the interior some of them were not built walls were complete and the correctly to the dimensions framing crew proceeded onto the specified. After much debate with roof for the shingling. the framing crew, the window vendor and me we reached a I should note that 2x4 compromise on sharing the cost of construction was used on the fixing the windows. The window interior walls as insulation was vendor took back the improperly not required on the interior sized windows and the framing walls. crew began the installation of the doors and what windows they Shingling the Roof could install. Fortunately the window vendor was able to return The last task to complete before to the site with the properly the house could be classified as sized windows within a few days "Buttoned Up" was to install the and the construction phase did shingles on the roof. Fortunately not miss a beat. my framing crew was also able to do this task, thus eliminating Completing the Interior the need for yet another Framing subcontractor. With the doors and windows I chose a 30 year architectural installed, the framing crew shingle due to the quality and proceeded to complete the look I was trying to achieve on Interior Framing. This was an the home. exciting time, as the rooms began to take real shape. You could now Though relatively a simple roof, walk down hallways and into it was quite large and the
weather was less than hospitable. I had met a few days before on Consequently it took nearly 2 site with the Electric weeks to complete this task. subcontractor to discuss the However, with the roof complete, placement of all the wall outlets my electric and plumbing and switches, as well as where contractors were now able to the light fixtures would be begin their work. situated. During our discussion he marked the wall studs for the Also, with the main house now placements of the electric wiring structurally complete, the boxes so that we could visualize framing crew moved onto the the entire electric wiring garage framing and construction scheme. We also marked where the phase. As a result of staging the telephone and cable boxes would garage behind the main home reside. construction phase, I was able to have subcontractors work in During the electrical rough in parallel without getting in each wiring phase, the electrician others way. installed all the wiring boxes and ran wire from the boxes to Rough Electric and where the main circuit panel box Plumbing would reside. With the house "Buttoned-Up", my Rough Plumbing Electric and Plumber subcontractors showed up to begin As with the Electrical the roughing in phase of their Subcontractor, I had met several respective tasks. weeks earlier with the Plumbing Contractor. During this meeting Rough Electric we discussed the form of heat for the home, as well as where the
bathrooms and kitchen were to and Rough Plumbing contractors reside in the home. We also had completed their tasks and had discussed types of bathroom successfully passed their fixtures including tubs, sinks respective inspections. and toilets. Consequently, when he showed up on site he new To Be Continued ... exactly where to run main drain and supply pipes and vent stacks. In Part 4 of "Building Your Dream He also roughed in all of the House", Electric and Plumbing plumbing for each bathroom and continue and the Kitchen Design kitchen plumbing fixture. is explained. Stay tuned... Within a week both the Electrical